WARWICK COURT Contractor: Mace        Architect: Fletcher Priest ³Õ²¹±ô³Ü±ð:Ìý£2.2³¾Â            Engineer: Waterman Atrium Infills to Levels 1-4 Structural steel and metal deck slab installation Metal deck slab Infills to existing stair and hoist openings RC Concrete Infills to stair, lift and riser openings RC Upstand installation to all levels Structural steel installation and riser formation to various levels Extension of existing steel web openings, Levels 1-4 Installation of new steel Stair Enclosure structure at Level 8 Installation of galvanised steel structures to the Level 8 North and South Adaptions and installation of new steels to the Level 8 Chiller enclosure Intumescent painting of all new structural steelwork