DLR – ROYAL MINT GARDENS Client: IJM Value: £8.8³¾ • Full electrical and mechanical installation along the full length of the 150m    tunnel. • Fire Main installed along the 150m Tunnel. • Two escape routes along the North and South of the encapsulation with a      steel framed walkway with phenolic walkway and GRP handrail. • 100m of Pre-cast plank installation with structural slab topping. • Western escape route construction: Steel sheet pile temporary works shaft    installed and within these the western stair core and stairs installed. • Fit out Western escape stairs E&M and all first and second fix items. • Install E&M °µÍø½ûµØ room for all E&M control gear. • Install 2 smoke extract fans under the E&M °µÍø½ûµØ room and all extraction      ductwork from western escape stairs. • Western and Eastern Barrow crossings installed for services to cross the       tracks. • Western escape stairs breakthrough.