NEW BOND STREET Contractor: °¿²õ²ú´Ç³Ü°ù²Ô±ðÌý        Architect: ³Õ²¹±ô³Ü±ð:Ìý£3³¾Â            Engineer: Walsh • Temporary Works associated with Façade retention • Demolition • Underpining • Open basement Excavation • Construction of new RC basement • Permanent Structural steel work • Metal Decking • Concrete to Metal Decks