°µÍø½ûµØ

15 PARK ROAD, BAKER STREET, LONDON NW1

Contract: JCT Intermediate Building Contract with Contractor Design 2005 Revision 2 (2009)
Value: £702,000
Duration: 40 weeks
Completed: November 2010
Architect: Kiran Curtis Associates
Project Manager/Cost Consultant: Malcolm Crouch Associates
Services Consultant: Paul Hardman Associates

This project contained many challenging structural aspects which were all undertaken to a landlocked plot which was accessed only via the front elevation and severely restricted by the confines of the TFL Red Route.

The basement floor was structurally lowered in line with the many Party Wall Award agreements and taking due cognisance of the basement neighbours which were operating sensitive dentistry and health clinics on either side of the property.

New floors were constructed whilst the front façade was supported with a carefully co- ordinated structural steel temporary support scheme sensitive to the Grade 2 Listing of the building.

A new fourth floor was formed at roof level increasing the capacity of the building to produce five high end apartments for private sale.